WEBVTT

00:00:00.400 --> 00:00:02.470
Welcome to Ask GAEA.

00:00:02.945 --> 00:00:05.250
This guide shows how to schedule concrete strength

00:00:05.265 --> 00:00:09.860
tests in GaeaSynergy. It follows a pour from a Concrete

00:00:09.875 --> 00:00:12.850
Tests task into the required ages in a saved

00:00:12.865 --> 00:00:14.470
compressive strength test.

00:00:16.585 --> 00:00:21.430
From the project Dashboard, choose File, New, Task, and

00:00:21.445 --> 00:00:25.230
select Concrete Tests. Name the task so the field and

00:00:25.245 --> 00:00:27.990
lab teams can match it to the pour.

00:00:29.005 --> 00:00:32.170
On Concrete Samples, select Concrete Compressive

00:00:32.185 --> 00:00:36.270
Strength. Check the specimen type, batch date, pour

00:00:36.285 --> 00:00:37.850
date, and strength units.

00:00:40.045 --> 00:00:43.870
In Required Test Ages, add the planned ages, such as

00:00:43.885 --> 00:00:45.530
seven and twenty-eight days.

00:00:47.345 --> 00:00:50.130
Enter the required strength at each age using the

00:00:50.145 --> 00:00:52.750
selected units and the approved test plan.

00:00:55.305 --> 00:00:58.570
Add each age in days to the pour date to verify the

00:00:58.585 --> 00:01:01.450
planned break dates. Save the task.

00:01:03.125 --> 00:01:07.970
Reopen the task. In Concrete Samples, use Create and

00:01:07.985 --> 00:01:09.430
select the sample location.

00:01:11.485 --> 00:01:14.410
Enter the field ID and check the inherited concrete

00:01:14.425 --> 00:01:19.230
data before saving. On the project Dashboard, open that

00:01:19.245 --> 00:01:22.390
sample and add a new Concrete Compressive Strength test

00:01:22.405 --> 00:01:26.010
under Geotechnical Tests. Choose the report template

00:01:26.025 --> 00:01:27.090
for your work.

00:01:30.105 --> 00:01:33.690
In the new test, check the pour date, specimen type,

00:01:33.705 --> 00:01:37.790
and strength units. On Data and Results, compare each

00:01:37.805 --> 00:01:41.170
Test Ages row and its corresponding Results row with

00:01:41.185 --> 00:01:45.190
the task. Account for unit differences if needed.

00:01:47.825 --> 00:01:50.970
Save and reopen the test to confirm the required ages

00:01:50.985 --> 00:01:52.450
and strengths are present.

00:01:54.425 --> 00:01:57.250
Enter actual measurements when the lab completes testing.

00:01:59.225 --> 00:02:02.210
The required ages and strengths are now recorded for

00:02:02.225 --> 00:02:05.670
the concrete sample. Keep the test plan with the saved

00:02:05.685 --> 00:02:08.490
test so the lab can check each planned break.

00:02:09.105 --> 00:02:12.170
For more walkthroughs, open Ask GAEA Guides.
