00:00:00.400 --> 00:00:03.340
In this Ask GAEA guide, you will adjust a

00:00:03.355 --> 00:00:05.930
cross-section’s scales and elevation limits.

00:00:07.005 --> 00:00:10.770
In GaeaSynergy, open Ask GAEA and choose the scales

00:00:10.785 --> 00:00:12.350
guide under Cross-sections.

00:00:13.525 --> 00:00:16.130
Have a saved practice section and check the units in

00:00:16.145 --> 00:00:17.110
its source records.

00:00:18.925 --> 00:00:20.350
Open the project and the section.

00:00:21.045 --> 00:00:23.910
Note a recognizable borehole spacing and elevation

00:00:23.925 --> 00:00:27.030
interval. Open Edit, Scales.

00:00:28.105 --> 00:00:30.470
Record the current horizontal and vertical scales,

00:00:30.865 --> 00:00:34.390
scale units, elevation units, and top and bottom

00:00:34.405 --> 00:00:36.410
settings before making changes.

00:00:37.985 --> 00:00:41.430
Set Scale Units, then enter the Horizontal Length Scale

00:00:41.445 --> 00:00:43.130
and Vertical Depth Scale.

00:00:43.725 --> 00:00:46.810
Each value represents real-world distance per page

00:00:46.825 --> 00:00:49.730
unit. Check the elevation units.

00:00:50.465 --> 00:00:54.050
Use Best Fit for a calculated limit, or clear it for a

00:00:54.065 --> 00:00:57.610
limit you set. Include the ground surface and needed

00:00:57.625 --> 00:00:58.730
borehole depths.

00:01:00.285 --> 00:01:03.470
With matching scale units, divide the horizontal scale

00:01:03.485 --> 00:01:04.890
by the vertical scale.

00:01:05.565 --> 00:01:09.150
For example, ten metres per centimetre horizontally and

00:01:09.165 --> 00:01:12.610
two metres per centimetre vertically produce five times

00:01:12.625 --> 00:01:16.910
vertical exaggeration. Check known distances and

00:01:16.925 --> 00:01:19.050
elevation intervals against the axes.

00:01:19.825 --> 00:01:23.010
Use page units for measured checks because screen zoom

00:01:23.025 --> 00:01:24.590
changes apparent size.

00:01:26.125 --> 00:01:28.970
Apply the settings and check the entire drawing.

00:01:29.745 --> 00:01:32.550
Include the first and last boreholes, the required

00:01:32.565 --> 00:01:35.530
elevation range, and all axis labels.

00:01:36.165 --> 00:01:39.510
If anything is clipped, revisit the scales, limits, or

00:01:39.525 --> 00:01:43.390
page layout. Save and reopen the section and confirm

00:01:43.405 --> 00:01:45.370
the settings in the Scales dialog.

00:01:46.825 --> 00:01:50.090
Keep both scales, their units, and the vertical

00:01:50.105 --> 00:01:53.290
exaggeration with the section before placing it in a

00:01:53.305 --> 00:01:59.293
project view. Find more step-by-step
walkthroughs in Ask GAEA Guides.