This example presents the 100 m Deviated Borehole DB-01 from the North Ridge Prospect in Ontario. The deviation survey is displayed beside lithologic descriptions, core samples, recovery, slake durability, USCS information and discontinuity observations.
Point-load strength, RQD and RMR profiles allow directional drilling information to be reviewed together with rock quality and engineering properties. Automated validation completed with 100% completeness, 85% confidence, and no errors or warnings.
The deviation profile shares the same measured-depth scale as lithology, sampling, discontinuities and engineering graphs. This makes changes in the borehole trajectory directly comparable with recovered material and rock-quality measurements.
The borehole progresses through sandy gravel, granite, altered granodiorite, a mafic dyke and quartz diorite. Point-load, RQD and RMR values show how strength and rock-mass quality vary along the deviated hole.
Review the finished log and validation report, or load the XML log and template into WinLoG.
© 2026 - All Rights Reserved