A complete 30 m roadway boring for the Highway 7 Widening and Rehabilitation project, integrating asphalt, granular base and subbase, embankment fill, native subgrade, twenty split-spoon samples, SPT N-values, recovery, groundwater, water content, Atterberg Limits, CBR, dry density, and competent glacial till.
Where XML files are provided, download the template and example log and import them into WinLoG Professional. The template can then be customized to match your company standards, project requirements, or agency format.
GAEA Technologies can assist with template design, migration, validation rules, and specialized borehole reporting workflows.
© 2026 - All Rights Reserved