Highway Investigation Example

Back to Example Library

2-page log
Geotechnical / Transportation

Highway Investigation Example

Integrated pavement, subgrade, sampling, CBR, and dry-density data for roadway design

A complete 30 m roadway boring for the Highway 7 Widening and Rehabilitation project, integrating asphalt, granular base and subbase, embankment fill, native subgrade, twenty split-spoon samples, SPT N-values, recovery, groundwater, water content, Atterberg Limits, CBR, dry density, and competent glacial till.

Capabilities Demonstrated

  • 30 m roadway boring
  • Pavement, base and subbase
  • Embankment fill and native subgrade
  • Twenty split-spoon samples
  • SPT N-values and recovery
  • Groundwater
  • Water content and Atterberg Limits
  • CBR and dry density
  • Competent glacial till
  • Two-page log
  • One validation warning
  • No validation errors
Full-size preview Downloads available Knowledge Center resources

Use This Example in WinLoG

Where XML files are provided, download the template and example log and import them into WinLoG Professional. The template can then be customized to match your company standards, project requirements, or agency format.

Need a Customized Template?

GAEA Technologies can assist with template design, migration, validation rules, and specialized borehole reporting workflows.

Contact GAEA Technologies

Return to WinLoG Example Library